MEC Engineers, Juara, Lembaga Kemajuan Bintulu, Construction Drawings & Specifications

Concrete Box Culverts, Details & Piling Changes 

 Concret Box Culverts, Piling Details

Dwg No:
MEC-1/2011

Download Box Culvert Drawing

 

Download Box Culvert Plan Layout

  • 150mm X 150mm RC Piles OK
  • 1500mm cts in direction of culvert flow, start from 150mm from culvert  edge approx
  • 2 piles per row 1500 cts OK
  • Put Piles directly under culvert walls or within the 45 degrees load spread.
  • Piles driven to set at about 4 inch/last 10 blows, if cannot set, stop and inform MEC the blows/ft,  Also keep piling log details counter signed by BDA Site Staff.
  • Maximum depth 2 lengths (6m length piles max=2x6=12m) or set whichever comes first. If ground is very soft based on site judgement, then stop and inform MEC immediately for review. Send driving logs, could be soft mud, silts, peat, sink holes or pockets.
  • Rev 1 - Top Slab, Bot Slab, T16-250c/c to have end L-hooks as shown, 300mm

Issued 27/Jan 2011, MEC Engineers, "Changes for Piling from Timber belian to RC piles".

For Technical Support Contact Us


LINKS TO ALL PAGES

  1. Drains & Culverts at Chainage 50
  2. New Concrete Bridge Design

 

 

 

 

To Order
Design EBooks
Contact Us

 
 Calculations & Worked Examples for Design of Drainage System.

 Drainage Calcs

 Calculations for Design of Water Reticulation System

 Water Supply

 Calculations for Design of Circular RC Water Tanks

RC Water Tanks

-----------------

 

Authur- Philip Goh (B.Sc, MIEM, P.Eng. MICE, C.Eng) MEC Engineers, Civil & Structural Engineer HP: 016-8672189, Email: Widget: email cloaker